ZweigWhite CE News Structural Engineer Rebuilding America's Infrastructure  
 

IN-DEPTH Articles
Just Added | Engineering & Construction | Product Applications | Project Spotlights | State-to-State | White Papers

New technology speeds bridge replacement in Utah
When it comes to bridge construction, time is not just a fourth dimension — it's a critical factor in determining the success of a project. Particularly when a replacement is involved, saving time reduces cost, minimizes disruption to the community, and enhances the safety of travelers and workers. Toward that end, the Utah Department of Transportation (UDOT) has implemented an innovative construction technique that enabled the replacement of 12 bridges in a two-month period during the summer of 2008 — an unprecedented achievement in the construction industry
 Read full article

Pages:  1 2 3 4

Links


Headlines From Around The Web

N.C. DOT to cut 400 positions (Winston-Salem Journal)
Georgia DOT commissioner resigns (Atlanta Journal-Constitution)
Georgia DOT loses another top manager (Atlanta Journal-Constitution)
New Road Signs Will Now Wait (The New York Times)
WYDOT staffer wins national post (Billings Gazette)
Schneider named acting IDOT director (The State Journal-Register)
Selection of MDOT director delayed (Hattiesburg American)



Events

  The Survey Summit
 July 7, 2011 - July 12, 2011, in San Diego California
  TRB 90th Annual Meeting
 January 23, 2011 - January 27, 2011, in Washington D.C.
  Autodesk University
 November 30, 2010 - December 2, 2010, in Las Vegas
  Trimble Dimensions 2010
 November 8, 2010 - November 10, 2010, in Las Vegas Nevada
  IHEEP 2010
 September 26, 2010 - September 30, 2010, in Dearborn Mich.

HubDOT Exclusive

In replacing the Willamette River Bridge, the Oregon Department of Transportation makes steps to ensure the structure's ecological footprint is as small as possible, leaving room for natural habitats to flourish.

  Bringing new life to the I-5 Willamette River Bridge

Webcasts


Related Engineering Channels